Turnkey HVAC, from calculation to handover.

One contract covers the design, BOQ, equipment, installation, testing, commissioning and documentation. The building team deals with one project team.
Scope
Design, supply, install, commission
Delivery
Single contract
Handover
Test records and documentation
Support
O&M and AMC
Commercial building with glass facade and curved canopy
Turnkey scopes keep design, procurement and site execution on the same drawings.

What turnkey covers.

The scope can start at a blank drawing or at an approved tender. In both cases the sequence closes at commissioning and handover.

What we need to start

  • Tender ID or GeM bid number
  • Approved BOQ or item schedule
  • Technical specifications
  • Architectural and HVAC drawings
  • Site address and access details
HVAC design and engineering
Heat load calculation
BOQ preparation
Technical specifications
Equipment procurement
Supply of HVAC equipment
Installation and execution
Ducting work
Refrigerant piping
Electrical and control work
Testing and commissioning
Performance testing
Handover and documentation
Operation and maintenance

The sequence.

Each step produces something the next step can use, from a load calculation to a commissioning record.

  1. 01

    Requirement and site review

    We review the building use, drawings, occupancy, available plant space and project timeline.

  2. 02

    Design and BOQ

    Heat load calculation, system selection, equipment schedule, BOQ and technical specifications are prepared.

  3. 03

    Supply and installation

    Approved equipment and materials are supplied and installed with coordinated site execution.

  4. 04

    Testing and commissioning

    Pressure testing, air balancing, control checks and performance verification are completed.

  5. 05

    Handover and support

    Documentation is handed over and maintenance or AMC support can continue after commissioning.

Auditorium interior with air distribution and tiered seating

What gets handed over.

  • Approved drawings and equipment selections
  • Installation and material records
  • Pressure test and commissioning records
  • Air balancing and performance observations
  • Operating and maintenance information
  • Spare and material handover, where applicable

One team accountable for the result.

A turnkey scope removes the gap between the consultant, supplier and installer. The same team that selects the equipment is responsible for installing and commissioning it.

Managing Director
Maksood Hussain
Manager
Mohammed Anas
Registration
GSTIN and Udyam

Bring us the drawing or the tender.

We will confirm the turnkey scope, the documents needed and the sequence for the site.

Maksood Hussain
Managing Director
88403 90617
Mohammed Anas
Manager
72390 59481
smartengineeringsolution9651@gmail.com
Gorakhnath office
Gorakhnath Mandir, Ansari Road, Gorakhnath, Gorakhpur, Uttar Pradesh 273015